Cegep Garneau - Renovation of
Physical Activity Centre

Project completed in a busy environment on schedule.
Completed
2017
2018
Client
Cégep Garneau
Year
2018
Sector
Institutional buildings
Category
Rehabilitation
Mandate
Fixed Price Project
Location
Quebec City, QC
Size
43,670 sq. ft.
Architects

CCM2

Project history
Complete redesign and upgrade of the electromechanical equipment.
QMD was mandated to renovate the interior and exterior of the Cégep Garneau's physical activity center in Quebec City. The work included the complete renovation of the exterior, insulation, doors and windows, and patching and painting of the training rooms, which were built in 1999.

The project included roof reconstruction and related work, the replacement of all mechanical ventilation and air-conditioning systems, electrical equipment and lighting, and the addition of a large mechanical room and a drying unit for the pool area.  Computer, multimedia and sound systems for the student areas completed our mandate.

Challenges
  • Work was carried out close to occupied premises without interfering with Cégep activities.
  • Work was carried out on a tight schedule; severe penalties were imposed for exceeding the schedule.
  • Project location: Proximity to a residential area with respect to authorized hours for noisy work