Project history
Demolition of 4 existing classrooms with bleachers and construction of two large classrooms with "U"-shaped bleachers, including acoustic panel systems for walls and ceilings.
The work also included installing an integrated lighting management system, including automated screens.
All the furniture was manufactured with space constraints in mind to bring everything into the classrooms, and everything was assembled on-site.